With the aim of achieving the ‘greenest’ possible mill infrastructure, we are investing in the energy-efficient refurbishment of our buildings. We have fitted the MI1 workshop with optimised heating technology, including control systems. In doing so, we replaced the ceiling panels and insulation and installed room thermostats in easily accessible locations. Both rooms in the workshop can now be heated independently of one another.

Following the implementation of this measure, heating energy consumption in the workshop has fallen by 40%. This is accompanied by a reduction of over 2.5 tonnes of CO2 emissions per year.
Steel that carries energy-efficient buildings.